Tendercast
All notices
TED — Tenders Electronic DailyEUcn-standard

Malta – Desalination apparatus – WSC/T/070/2026 - DESIGN, SUPPLY, INSTALL, COMMISSION AND HAND-OVER OF NEW SWRO PLANT “D” AT PEMBROKE RO PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

Water Services Corporation

Scope as published

The project scope is to issue an EU funded tender for the design, supply, install, commission and hand-over of a SWRO Plant located within the existing Pembroke RO Plant at Pembroke, Malta. The Plant’s nominal capacity shall be 11,200 m3/day with a potential maximum capacity of at least 13,000 m3/day produced from two (2) independent and identical RO systems. During installation, testing and up to the commissioning of the new plant, the existing SWRO plant and its’ ancillary equipment shall remain in operation, and production shall not be jeopardized. The Contractor/s shall be responsible for all mechanical and electrical works to construct this plant to the specified capacities.

Deadline
11 Nov 2026(37 days left)
Published
4 Oct 2026(yesterday)
Contract value
€10.2m
Location
Malta
Reference
681719-2026
First seen
1 hour ago

Classifications

4291234042912350

Other open notices from this source