Boiler Plant Replacement & Hybrid Controls Integration at Eckington Active, Gosber Street, Eckington
North East Derbyshire District Council
Scope as published
NEDDC wishes to appoint a contractor for the design, supply, installation, integration, commissioning and handover of replacement gas-fired boiler plant at Eckington Active. The installation is required to provide supplementary, resilience and back-up heating capacity to the existing ASHP-led heating system.
- Deadline
- 9 Oct 2026(5 days left)
- Published
- 24 Sept 2026(10 days ago)
- Contract value
- £62,500
- Location
- United Kingdom
- Reference
ocds-h6vhtk-077922- First seen
- 10 days ago