Germany – Pipeline-inspection services – ILI HYRER/HYREL
GASCADE Gastransport GmbH
Scope as published
For the pipeline sections 1 to 3 mechanical cleaning using i.e. bi-directional cleaning pigs is considered. Four (4) cleaning pig runs shall be assumed to be required per pipeline section. For the very first cleaning pig run per section a bi-directional pig must be offered which shall proof pig passage by either mechanical or intelligent gauge plate(s).