The Dean Trust is a multi-academy trust established in 2012 and comprises schools located across, Manchester, Trafford, Knowsley and Wigan; across four local authorities. The Trust are seeking a contractor to provide cleaning of a regular and routine nature, together with more specific periodical cleaning outside of the term-time operation across 11 of its schools. The contract will be awarded for a period of 3 years commencing 1st September 2027. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18592. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18592 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
This opportunity supports the delivery of the HS2 programme and involves the transportation of precast concrete slab-track units from the PACADAR UK factory to multiple locations along the HS2 route. The requirement is for approximately 12,000 slabs, equating to around 2,400 HGV loads, making it a significant logistics package with a consistent volume of work. Suppliers will be required to provide suitable HGV transport capable of safely carrying five slab units per load while complying with all relevant transport, safety and load restraint regulations. Deliveries will be made to various locations along the HS2 corridor, with loading at the factory and offloading at site undertaken by others. Interested suppliers will be asked to demonstrate their transport capability, available fleet capacity and proposed delivery approach, together with competitive commercial rates. Further information on the scope, delivery requirements, indicative volumes and pricing structure is available within the attached documentation.
Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires a Groundworks sub-contractor for our new build housing development consisting of 57no new build plots in Coulson Park, Ashington, Northumberland. All tender documentation can be found on the ProContract Portal.
The Trust is looking to appoint a supplier to provide CAMHs Tier 4 bed and associated services in the BNSSG area. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18594. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18594 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Avon and Wiltshire Mental Health Partnership NHS trust
WAGR Overview and Site Information The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55). Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards. All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities. Project Scope The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements. Key activities include (see attachment) - Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities. - Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements. - Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover. - Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient. - Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works. - Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery. - Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required. - Procurement: Procurement of materials, equipment and associated quality documentation. - Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators. - Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues. - Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures. - Decontamination: Decontamination activities to support area declassification and radiological rollback. - Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation. - Scaffolding Services: Provision of scaffolding design, supply and installation resources as required. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract