Tendercast
All notices
World Bank Procurement NoticesGlobalRequest for Expression of Interest

National Consultant for Coordination with OJSC “Tunduk” on the Implementation of Digital Health Solutions

PIU of Ministry of Health of KR

Scope as published

SDTF No. TF C7573-KG: The Ministry of Health of the Kyrgyz Republic's "Primary Health Care Quality Improvement Operation (PHCQIO) Additional Financing" project, financed by the World Bank, announces a competition for the following vacant position: Date of publication: 27-10-2026 Deadline for applications: 11-11-2026 As part of the implementation of the Primary Health Care Quality Improvement Operation (PHCQIO) Additional Financing Project, financed by the World Bank, the Ministry of Health of the Kyrgyz Republic announces a competition for the following vacant position: National Consultant for Coordination with the State Institution "Kyzmat" on the Implementation of Digital Health Solutions Qualification Requirements: higher education in information technology, health care, public administration, economics, or a related field; at least 2 years of direct experience in digital health, including business process analysis, digital project coordination, information systems implementation, or digital team leadership; experience coordinating projects involving government authorities and organizations responsible for the technical implementation of information systems; experience preparing and monitoring work plans, meeting minutes, official correspondence, analytical materials, and reports; knowledge of digital solutions and information systems used in the health system of the Kyrgyz Republic, including Sanarip Clinic, the iLab LIS, and the National BI Platform, is an advantage; fluency in Kyrgyz and Russian; proficiency in Microsoft Office, particularly Excel, Word, and PowerPoint, as well as task management, planning, and monitoring tools such as ClickUp, Trello, or Asana; skills in using collaboration and document-sharing tools, such as Microsoft Teams and SharePoint or equivalent solutions; skills in preparing analytical reports and data visualizations using Power BI or equivalent tools are an advantage. Interested candidates are invited to send their CV, indicating their contact telephone number and position in English and Russian, letters of recommendation from their place of work, copies of relevant diplomas and certificates, as well as the contact details of at least two referees for verification of references, by 18:00 on November 11, 2026, by email: [email protected]; [email protected]; [email protected]; or by mail to Kyrgyzstan, Bishkek, Togolok-Moldo 1a St, 1nd floor, No. 12. Documents must be submitted in PDF format, and resumes must be signed. Applications without the job title, containing an incomplete set of documents, or received after the deadline will not be considered. Only the most suitable candidates will be invited for an interview. Detailed information regarding the eligibility requirements and technical specifications is available on the EGZ portal in the Announcements section, under Procurements Announced by Projects.

Deadline
11 Nov 2026(12 days left)
Published
29 Oct 2026(2 days ago)
Contract value
Not published
Location
Cayman Islands
Reference
OP00477942
First seen
2 hours ago

Classifications

CSIndividual Consultant SelectionP167598CS-2.13

Other open notices from this source

World Bank Procurement NoticesGeneral Procurement Notice

Kyrgyz Republic National Irrigation Investment Program

GENERAL PROCUREMENT NOTICE Country: Kyrgyz Republic Project: KYRGYZ REPUBLIC NATIONAL IRRIGATION INVESTMENT PROGRAM Project ID No. P515521 Implementing Agency: Water Resources Service under the Ministry of Water Resources, Agriculture and Processing Industry of the Kyrgyz Republic The Kyrgyz Republic has received financing in the amount of US$ 172 000 000 (one hundred seventy two million) equivalent from the World Bank (WB), Asian Infrastructure Investment Bank (AIIB), the OPEC Fund and Swiss Agency for Development and Cooperation (SDC) toward the cost of the Kyrgyz Republic National Irrigation Investment Program (Project), and it intends to apply part of the proceeds to payments for goods, works, non-consulting services and consulting services to be procured under this Project. The Project will include the following components: Component 1: Infrastructure Investments: Overall, Component 1 will lay the physical and technological foundation for more efficient, resilient, and climate-smart irrigation systems, directly contributing to improved water management, sustainable agricultural production, climate adaptation and mitigation. Specifically, this component will finance investments (civil works, goods, equipment, and services) to increase the efficiency, access and reliability of I&D infrastructure and services. Priority investments include upgrading critical water regulation facilities and enhancing dam safety, and groundwater development to reduce the impact of droughts and climate change-driven water scarcity; modernizing irrigation conveyance and distribution infrastructure using modern lining technologies, and materials resistant to high-temperature variations that withstand ground movements in landslide-prone areas, and reforestation along the right-of-way to prevent sedimentation along the canals and downstream rivers. The Project will also finance hydromechanical works to reduce energy consumption and minimize greenhouse (GHG) emissions. Further, the project will support the adoption of climate-smart irrigation technologies and agriculture practices to optimize water use at both system and farm levels, thus reducing the vulnerability to climate change impacts for farmers and rural communities. To further increase the reliability of irrigation services and the productivity of irrigated agriculture, the component will also finance smart water measurement and monitoring systems to strengthen irrigation water management and accounting. This Component consists of the following subcomponents Sub-component 1.1 - Irrigation and drainage infrastructure modernization will finance the: (i) modernization and upgrade of 440 km of hydraulic and hydromechanical I&D infrastructure covering 82,000 ha to reduce water losses, improve conveyance efficiency, and strengthen operational reliability, reducing drought vulnerability and increasing food security; (ii) development and upgrade of 10 regulation structures and groundwater sources, including rehabilitation and optimization of existing storage facilities, to reduce sedimentation, improve water availability and enable drought resilient irrigation services; (iii) dam safety improvements for two priority interstate structures, including instrumentation and hydrological monitoring systems, civil, hydraulic and hydromechanical works to ensure compliance with technical and environmental standards and improve their operational performance; and (iv)modernization and automation of water allocation, measurement and monitoring systems along all primary canals using supervisory control and data acquisition (SCADA) systems to enable equitable water distribution and accurate water accounting, better system management, and transparent service provision. Sub-component 1.2 - Scalable pilot on irrigated agriculture and on farm smart water-management will finance climate-smart onfarm and value chain interventions that leverage improved irrigation services financed under Subcomponent 1.1 to improve clima…

Water Resources Service under the Ministry of Agriculture of the Kyrgyz Republic
Cayman Islands
World Bank Procurement NoticesInvitation for Bids

Design, supply and installation of Isanova substation 220 kV

Specific Procurement Notice Request for Bids Plant Design, Supply and Installation (Two-envelope Bidding Process, Without Prequalification) Employer : Ministry of Energy of the Kyrgyz Republic Project: Kyrgyz Renewable Energy Development (KRED) Phase 1 Contract title : Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV "Isanova" Substation and Associated 110/35/10 kV Substation Extensions (Kara Shoro, Karatay and Kara Kuldzha), including Associated Transmission Line Connection and Interface Works Country: Kyrgyz Republic Loan No. /Credit No. / Grant No.: 7370-KG / F 3790- G RFB No: KG/KRED/W/2023/RFB-04 Issued on: October 27, 2026 1. The Government of the Kyrgyz Republic has received financing from the World Bank toward the cost of the Kyrgyz Renewable Energy Development Project (KRED) and intends to apply part of the proceeds toward payments under the Contract for Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV "Isanova" Substation and Associated 110/35/10 kV Substation Extensions (Kara Shoro, Karatay and Kara Kuldzha), including Associated Transmission Line Connection and Interface Works. 2. The Ministry of Energy of the Kyrgyz Republic, through its Project Management Office (PMO), now invites sealed Bids from eligible Bidders for the Design, Supply, Installation, Testing and Commissioning of the 220/110/10 kV "Isanova" Substation and Associated 110/35/10 kV Substation Extensions, including Associated Transmission Line Connection and Interface Works, under a single lump-sum Design, Supply and Installation (DSI) Contract. 3. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB), Single-Stage, Two-Envelope procedure, as specified in the World Bank Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (the "Procurement Regulations") and is open to all eligible Bidders as defined in the Procurement Regulations. In addition, please refer to the Procurement Regulations setting forth the World Bank's policy on conflict of interest. 4. Interested eligible Bidders may obtain further information from the Project Management Office (PMO), Ministry of Energy of the Kyrgyz Republic, Attn.: Mr. Gulzhigit Murzakarimov, Director, E-mail: [email protected], and inspect the bidding documents during office hours from 09:00 to 17:00 hours (Bishkek Time) at the address given below. 5. The bidding document in English may be obtained free of charge by interested eligible Bidders upon submission of a written request to the address below. The bidding documents will be transmitted electronically. 6. Bids must be delivered to the address below on or before 14:00 (Bishkek Time) on December 09, 2026. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked "ORIGINAL BID", and the inner envelopes marked "TECHNICAL PART" will be publicly opened at 14:00 (Bishkek Time) on December 09, 2026 at the address below in the presence of the Bidders' designated representatives and anyone who chooses to attend. All envelopes marked "FINANCIAL PART" shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening. 7. All Bids must be accompanied by a Bid Security of United States Dollars Four Hundred Thousand (USD 400,000), or an equivalent amount in a freely convertible currency. 8. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder's beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document 9. The address referred to above is: Kyrgyz Renewable Energy Development (KRED) - Ministry of Energy of the Kyrgyz Republic For the attention: Mr. Gulzhigit Murzakarimov, Director 326 Jibek-Jolu Street Bishkek 720000 Kyrgyz Republic Tel: +996555730076 E-mail: [email protected] and [email protected] Web site: https…

Ministry of Energy KR
Cayman Islands
9 Dec 2026(40d)
World Bank Procurement NoticesContract Award

Consulting Services for the Development of a Detailed Interior and Exhibition-Space Design for the Cave Museum (STC) and the Provision of Author Supervision

Contract Award Project: P167428-Kyrgyz Republic Regional Economic Development Project Loan/Credit/TF Info: IDA-65580; IDA-D5700 Bid/Contract Reference No: ARIS-IDA-REDP-AF-CS-CQS-2026-5 Procurement Method: CQS-Consultant Qualification Selection Scope of Contract: Consulting Services for the Development of a Detailed Interior and Exhibition-Space Design for the Cave Museum (STC) and the Provision of Author Supervision Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2026/08/28 Duration of Contract 6 Month(s) Minimum Qualifying Score 75 Awarded Firm(s): KAZSRDIMC (1135504) Almaty c., Atameken, 188/1 Country: Kazakhstan Registry ID: 050000 Scores Technical: 92.60 Consultant Specific Experience: 0 Methodology: 18.56 Key Personnel: 74.04 Transfer of Knowledge: 0 Participation by Nationals: 0 Financial: 1 Combined: 1 Rank: 1 Final Evaluation Price USD 109874.31 Signed Contract Price USD 109874.31 Price: Currency: Amount: United States Dollars (United States Dollars) 109874.31

Kyrgyz Republic Regional Economic Development Project
Cayman Islands
World Bank Procurement NoticesContract Award

Consulting Services for the Development of a Detailed Interior and Exhibition-Space Design for the Uzgen New Museum and the Provision of Author Supervision

Contract Award Project: P167428-Kyrgyz Republic Regional Economic Development Project Loan/Credit/TF Info: IDA-65580; IDA-D5700 Bid/Contract Reference No: ARIS-IDA-REDP-AF-CS-CQS-2026-6 Procurement Method: CQS-Consultant Qualification Selection Scope of Contract: Consulting Services for the Development of a Detailed Interior and Exhibition-Space Design for the Uzgen New Museum and the Provision of Author Supervision Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2026/08/28 Duration of Contract 6 Month(s) Minimum Qualifying Score 75 Awarded Firm(s): KAZSRDIMC (1135504) Almaty c., Atameken, 188/1 Country: Kazakhstan Registry ID: 050000 Scores Technical: 92.60 Consultant Specific Experience: 0 Methodology: 18.56 Key Personnel: 74.04 Transfer of Knowledge: 0 Participation by Nationals: 0 Financial: 1 Combined: 1 Rank: 1 Final Evaluation Price USD 131053.71 Signed Contract Price USD 131053.71 Price: Currency: Amount: United States Dollars (United States Dollars) 131053.71

Kyrgyz Republic Regional Economic Development Project
Cayman Islands