North Wooton Pump and Pre-Cast Concrete Units Supply
Kings Lynn Internal Drainage Board
Scope as published
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The value is estimated at circa £390,000 total. These figures are exclusive of VAT. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King’s Lynn Internal Drainage Board working with Turner & Townsend as advisors.
- Deadline
- 20 Oct 2026(16 days left)
- Published
- 18 Sept 2026(16 days ago)
- Contract value
- £390,000
- Location
- United Kingdom
- Reference
ocds-h6vhtk-077549- First seen
- 16 days ago