Refurbishment of Newport Central Library and Museum
Cyson Cymru
Scope as published
The contract comprises five core interlinked phases of work across the South and West elevations, alongside localised internal remediation: • Asbestos Remediation: The safe, licensed containment, removal, and disposal of identified asbestos-containing materials (ACMs), specifically focusing on the external window mastic and internal packing panels. • Window Replacement: De-glazing, removal, and lawful disposal of degraded window units, followed by the installation of high-performance, thermally broken, double-glazed aluminium units matching original architectural sightlines. • Structural Concrete Repairs: Mechanical breakout of defective cladding panels to a sound core, preparation and priming of exposed reinforcement steel, and profiling using a structural polymer-modified mortar system. • Anti-Carbonation Protective Coating: Application of a breathable, anti-carbonation surface treatment across the repaired external concrete cladding panels to ensure long-term structural integrity and aesthetic consistency. • Minor Internal Making Good: Plasterwork repairs, drywall stabilization, and complete redecoration of internal window reveals, sills, and adjacent walls impacted by the window extraction.
- Deadline
- 15 Oct 2026(12 days left)
- Published
- 18 Sept 2026(16 days ago)
- Contract value
- £600,000
- Location
- United Kingdom
- Reference
ocds-h6vhtk-07758e- First seen
- 16 days ago