Class 331 Heavy Maintenance infrastructure upgrade Allerton TCC
Northern Trains Limited
Scope as published
Scope of Works: The supplier shall provide facilities capable of supporting the Heavy Maintenance re-quirements of the Class 331 fleet. The Class 331 Heavy Maintenance programme needs to start no later than 1st March 2028 to ensure that the Heavy Maintenance activities can be undertaken within the required maintenance schedule of the fleet and ensure it does not have a detrimental impact on customer rail services. - All design, construction, EIS, handover and training is required to have been completed in advance of the 1st March 2028. A high level programme is to be generated by the contractor as part of the tender process A key part of this programme is the replacement of bogies across the fleet, which needs to happen in an efficient way to maintain programme. 4-road at Allerton has been iden-tified as the location where this work will take place. To undertake bogie change re-placement on 4-road, the following items will need to be installed/addressed: · Installation of a vehicle jacking system capable of lifting 3 x class 331 vehicles in a synchronized manner without the need for splitting/decoupling the units. The system shall also be capable of jacking single and two car units. · To facilitate the vehicle jacking system, there will be a need for the supplier to ensure that the floor is capable to safely withstand the expected loads when jacking a Class 331, and that the floor is suitably level and flat for the jacks. Sur-veys will be required in order to validate this. · The supplier shall ensure that the jacks are interlocked with the Depot Protec-tion system so that no rail vehicle movements can take place unless jacks are in the stowed/birthed position. · The design shall ensure that there is adequate clearance for personnel to safely walk around the jacks in both operational and stowed positions. The preference is for the jacks to be mounted on rails and be compact to maximise clearance around the jacks. · Road 4 pits and floorings shall painted. · Circa 30m x 1.5m along road 4 has a side pitted area. As part of this work there would be a need to bring the height of these side pits to be level with the adja-cent flooring in order to accommodate the jacks and facilitate easy removal of jacks if required. This area should be reinforced throughout to enable jacking of any class of vehicle. As per design development a barrier should be considered between road 4 and 5 along this section to prevent the risk of falling from height from road 4 into the side pit of road 5, this cannot be of detriment to operations on adjacent road. · There is currently roof access equipment and a crane situated along road 4. NTL would like to retain this equipment. The expected positions of the jacks on road 4 have been marked out and it is not expected that the jacks would foul with these items of equipment. However, there will be a need for the supplier to vali-date that during lifting operations that the train is adequately clear of the roof ac-cess equipment. The supplier should make provision for modifications to the roof access equipment to ensure adequate clearance is achieved. · Once vehicles are lifted, the bogies would be rolled by hand along the rail to ei-ther end of the shed where a forklift will be used to lift the bogies and transfer to a storage location. There will be a need for the supplier to design and build a level concrete hardstanding to be extended on both ends of the shed in order to support the safe lifting of bogies by a forklift and the transfer of components from the hardstanding on road 4 to an identified storage location. · Storage for a minimum of 12 bogies in total, to be segregated into “clean” and “dirty” bogie storage. The ability to store 16 bogies in total should be explored within the designated area, to provide potential future capability. The identified location for storing the bogies is shown in the image below. · A battery forklift truck is proposed to be used. The supplier is required to work with NT…
- Deadline
- 5 Oct 2026(32 days left)
- Published
- 3 Sept 2026(4 hours ago)
- Contract value
- £2.1m
- Location
- United Kingdom
- Reference
ocds-h6vhtk-06f195- First seen
- 3 hours ago