Lot 1: Improving the 1.5-Kilometer airport to Pou Bay Bridge Road in Chuuk • Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges in Yap • Lot 3: Replacing the 12-meter Awak bridge
Department of Transportation, Communications and Infrastructure
Scope as published
Specific Procurement Notice Request for Bids, Works Reconstruction of roads and bridges across the Federated States of Micronesia Employer Department of Transportation, Communications and Infrastructure Project FSM Prioritized Road Investment and Management Enhancements Project: P172225 Contract title Lot 1: Improving the 2.4 Km Airport to Pou Bay Bridge Road in Chuuk Lot 2: Replacing Two short-span (6-meter-long) steel and concrete composite bridges in Yap (Road 0.316 Km approaches to the Bridge) Lot 3: Replacing the 12-Meter Awak bridge in Pohnpei (Road 0.330 Km approaches to the Bridge) Country Federated States of Micronesia Loan No. IDA-D7790 RFB No FM-DOTCI-572568-CW-RFB Issued on 22 October 2026 The Federated States of Micronesia has received financing from the World Bank toward the cost of the P172225-FSM Prioritized Road Investment and Management Enhancements Project (PRIME) and intends to apply part of the proceeds toward payments under the contracts: The Borrower shall process payments as defined in the World Bank's "Disbursement Guidelines for Investment Project Financing" and the project's Disbursement and Financial Information Letter. Lot 1: Improving the 2.4 Km airport to Pou Bay Bridge Road in Chuuk; Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges (Road 0.316Km approaches to the Bridge) in Yap and Lot 3: Replacing the 12-meter Awak Bridge in Pohnpei (Road 0.33Km approaches to the Bridge) . 1 The Department of Transportation, Communications and Infrastructure (DoTCI) now invites sealed Bids from eligible Bidders for the following lots: Sl. No. Contract Name Contract Description Contract Period 1 Lot 1: Improving the 2.4 Km airport to Pou Bay Bridge Road in Chuuk Construction of 2.4 Km length and 6.4 meter wide Rigid Pavement Road, including 9 Nos. Concrete Box Structures, Lined Side Drains, and associated ancillaries works; and construction of temporary diversion road, cross drainage structures to facilitate traffic movement during construction with safety measures. Construction Period: 365 days Defect Notification Period: 365 days 2 Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges in Yap Construction of 0.316 Km length and 7.16 Meter width flexible pavement road, including the complete replacement of two short-span (6 Meter long permanent steel and concrete composite bridges), construction of 2 Nos. pipe culverts, 2 Nos. concrete box structures (8 Meter x 9.65 Meter), lined side drains, and associated ancillary works, together with the construction of temporary diversion road, cross drainage structures including temporary Steel bridges ( 36.5 Meter x 6.4 Meter or approved equivalent structural bridges) to facilitate traffic movement during construction with safety measures. Construction Period: 455 days Defect Notification Period: 365 days 3 Lot 3: Replacing the 12-Meter Awak Bridge in Pohnpei Construction of 0.330 Km length and 7 Meter width flexible pavement road, including the complete replacement of 12 Meter bridge which includes construction of 1 No. Bridge structure (18.2 Meter x 9.75 Meter), 2 Nos. concrete box structures, lined side drains, and associated ancillary works, together with construction of temporary diversion road, cross drainage structures including temporary Steel bridges (18.2 Meter x 6.4 Meter or approved equivalent structural bridges) to facilitate traffic movement during construction with safety measures. Construction Period: 365 days Defect Notification Period: 365 days Only eligible bidders who meet the below key qualification criteria may participate in this bidding. Item Qualification Criteria (US$ million) LOT 1 LOT 2 LOT 3 Minimum Average Annual Construction Turnover within last 5 years 9.2 3.75 4.1 Minimum Financial Resources 2.55 1.04 1.13 Contracts of Similar Size and Nature 6.12 3.12 2.72 Construction Experience in Key Activities Construction of Minimum Cumulative length of 2.25 Km of Rigid Concrete Pavemen…
- Deadline
- 7 Dec 2026(45 days left)
- Published
- 22 Oct 2026(2 days ago)
- Contract value
- Not published
- Location
- MI
- Reference
OP00476469- First seen
- 41 minutes ago