FDIS - Brampton Pump House Remediation - FY2026/27 - Amey Central Region - East
AMEY DEFENCE SERVICES LIMITED
Scope as published
Central Region - East Brief scope of works (subject to confirmation): A specialist inspection has identified significant defects with the existing pumping station, principally relating to the incoming electrical supply, flooding/water ingress, safe access arrangements and the condition of the pumps. 1. Make safe / maintain isolation 2. Resolve the incoming electrical supply 3. Develop a permanent safe-access solution 4. Address flooding and groundwater ingress 5. Remove and inspect both pumps 6. Undertake wet-well remedial works 7. Investigate Inlet No. 2 8. Review ancillary works 9. Recommission only following remedial works Further details on the attached. Amey have been tasked by the DIO through the FDIS to deliver the RAMS for the Central Region. This notice is a call for competition and there may not be a further notice related to this opportunity. For Amey to accept any EoI it is ESSENTIAL that any subcontractor is: • willing to act as Main Cttr; • a Verified member of Constructionline (G), relevant Wk Cat MUST show that Subctt is possible, and the 'BSAct - Std Con' must be Verified; • capable of working in a BIM Level 2; • compliant with DefStan 05-138; • willing to work with Amey to deliver Soc Val to our Client; ideally, complete the Soc Val Goal within the Constructionline platform. DESIRABLE attributes of our Supply Chain: • have a CSR policy; • have a Bus Cont and Disaster Recovery Plan If successful the subcontractor will need to pass a PQQ, sign up to ADS T and C, and meet the MoD Security Requirements. This future opportunity notice is for Expressions of Interest, BY EMAIL ONLY. Procurement Documentation will follow separately via a link from our e-tender portal (Curtis Fitch). Note 1: The bidder must quote for all aspects of the Works. Note 2: Future works of a similar nature may be negotiated based upon submitted rates. Note 3: Those making an Expression of Interest will be required to sign-up to our 'Sub-contract Agreement' where 'Mini Competitions' or 'Call Offs' will be used to tender works/services. Note 4: For complex projects such as External Wall Insulation installation, Structural works etc. it is a requirement that the bidder must (at Contract Award) carry PI Insurance cover of not less than £1,000,000. Note 5: Those making an EoI will be assessed in accordance with the Public Contract Regulations 2015 i.e. Regulations 57, 58 & 60. ADS expressly reserves the right to require those making an EoI to provide additional information supplementing or clarifying any of the information requested. Note 6: Depending on Amey's annual spend with individual bidders you may be required to either have committed to the Science Based Targets Initiative (SBTi), set SBTi approved near-term targets, or Net Zero targets. This opportunity is also advertised on Constructionline. ADS does not bind itself to accept any tender and is not liable for any costs incurred by those expressing an interest or tendering for this opportunity.
- Deadline
- Not published
- Published
- 4 Nov 2026(7 hours ago)
- Contract value
- £113,000
- Location
- United Kingdom
- Reference
ocds-b5fd17-10b00167-a79a-478a-af71-fda92169a5e9- First seen
- 2 hours ago